What is the accurate and standard method of manpower estimation in construction projects?

Manpower Estimates depend on only two factors:-
1. Market Rate - very directly available on market analysis / survey
2. Productivity Rate - available in CPWD standards - Delhi Schedule of rates
But productivity Rate in reality inturn is depends on the following:
1. Skill Level of Workforces
2. Availability of Material and information to work with
3. Quality measures and Workmanship expected
4. Safety measures in place
5. Risk Factor
6. Environmental Factors
Thus a judicious productivity rate to be assumed for calculating MANPOWER Estimates in a project..!!!