It has been observed from past experience that major wastage are in Bulk Materials only (say Cement, Sand, Aggregates, Bricks, Steel etc. in Construction projects).
Hence the only way to reduce wastage is through following measures:
  • Scope of Work to be defined clearly
  • Periodic plan for respective scope of work required
  • Material Specification and Unit Consumption arrived
  • Procurement cycle considering the Lead Time in line with periodic work plan prepared to followed up.
  • Regular Reconciliation of Bulk material indented against work executed to arrive at wastage.
  • Implement corrective and preventive measures